Skip to content
Project information
Project at a glance.
Project name Xiamen Cruise Center Walkway
Membrane system PTFE
Application Parking & Transportation
Structure type Pedestrian walkway canopy Project overview
The project. A sequence of white membrane bays follows the passenger route outside the cruise center. The overhead view shows the changes in direction, while the view from the walkway reveals the rhythm of the supports.
Engineering & fabrication
From design to delivery. + Installation Support At the walkway edge, the membrane is fitted over the supporting framework before the finished bays form a continuous route.
Project gallery
A closer look. Project enquiry
Discuss your next project. Share your drawings, dimensions and the support you need.
Discuss Your Project→ × ← → Let’s shape your next project
Tell us about the space you have in mind. Share the intended use, approximate dimensions and what you need us to help with.
Start Your Project Search CNYISI ×
Search systems, applications and services
Start a conversation ×
Tell us what you’re planning. Share your project or product requirements. Your enquiry will be saved privately and sent to our sales team.
× AI concept visual · for design review only.
Planned product video ×
Opening. Closing. Clearly demonstrated. This space is reserved for footage of the confirmed motorized model. The review does not simulate an unverified opening mechanism.
01 / Fully open 02 / Actual operation 03 / Fully closed
Video, controls and operating conditions: awaiting confirmed product information.
Your analytics choice Optional analytics helps us understand website visits and enquiries. Analytics stays off until you allow it. Privacy notice
Allow analytics Reject analytics