Home / Who We Help / General Contractors
General Contractors

Define the package before it reaches the site.

Bring the tender information, construction program and proposed scope boundaries. Clarify how membrane, steelwork, foundations, delivery and installation connect with the rest of the works before the package is finalized.

Installation coordination concept with site professionals beside a canopy frame and packed membrane panels
AI architectural concept render. Not a completed CNYISI project.
The project starts here

Make interfaces visible before pricing and scheduling.

A clear canopy package identifies both the supplied elements and the work performed by others. Review civil works, setting-out, services, access and the installation sequence alongside the drawings so the quotation is based on an understood scope.

Your project priorities

Focus the first conversation.

01

Package boundaries

List who designs and supplies the frame, membrane, connections and foundations, and which site works are carried by others.

02

Construction sequence

Discuss access, staging, lifting requirements and interfaces with adjacent trades before agreeing the site program.

03

Submissions & handover

Identify the drawing review process, inspection requirements and records needed to close out the package.

Working together

A clearer path to the next decision.

01

Review the available information

Send drawings, scope notes and the construction milestones relevant to the canopy package.

02

Coordinate the interfaces

Confirm the parties responsible for design inputs, foundations, services, unloading and installation support.

03

Agree the release points

Define when drawings, material selections and site conditions need confirmation before work progresses.

What to send

Bring the information your team already has.

Share what is available and mark approximate information. We will use it to clarify the next questions and the support your project needs.

Discuss this project →
  • Tender or construction drawings and scope notes
  • Package inclusions, exclusions and adjacent trades
  • Site access, staging and available work areas
  • Required submissions, inspections and handover records
  • Program milestones and the responsible project contacts
Before you begin

Useful project questions.

Can overseas installation personnel be arranged?

Yes. Personnel can be arranged for on-site work. The agreed installation scope, travel arrangements, equipment, local support and site readiness must be coordinated for the particular project.

What should be settled before fabrication is released?

Agree the required drawing and material approvals, responsibility boundaries and relevant site information. The release process should be defined with the project team rather than inferred from a preliminary quotation.

CNYISI · Shade. Space. Possibility.

Clarify the canopy package with your project team.

Send your project brief. Overseas on-site personnel can be arranged; responsibilities and installation scope are agreed for each project.

Request a project quote →
Let’s shape your next project

Tell us about the
space you have in mind.

Share the intended use, approximate dimensions and what you need us to help with.

Search CNYISI

Start a conversation

Tell us what
you’re planning.

Share your project or product requirements. Your enquiry will be saved privately and sent to our sales team.

Enquiry type

Enquiry source: General Contractors

Drawings and photographs can be shared by email. A WhatsApp click opens the conversation; it is not a submitted enquiry.

AI concept visual · for design review only.

Planned product video

Opening. Closing.
Clearly demonstrated.

This space is reserved for footage of the confirmed motorized model. The review does not simulate an unverified opening mechanism.

01 / Fully open02 / Actual operation03 / Fully closed

Video, controls and operating conditions: awaiting confirmed product information.